Orano signs with CleanuC to optimise a nuclear facility operating costs

CleanuC signs its first contract with ORANO to provide elements leading to the optimisation of the operating costs of a facility undergoing decommissioning. This study will be based on a rationalisation of the nuclear safety approach taking into account the updated configuration of the facility.

This contract confirms the industry’s interest in the innovative approach and method developed by CleanuC to respond to its needs. This approach combines the know-how in rationalising the nuclear safety analysis with CleanuC’s knowledge base on operating and decommissioning costs.

Leave a Reply